Customized Double-Decker Mobile Housing Steel Container Dormitory Construction Sites Hotels Simple Assembly Detachable Design България
- Introduction
Introduction
Dongji
Launching the Customized Double-Decker Mobile Housing Steel Container Dormitory Construction Sites Hotels Simple Assembly Detachable Design, the solution construction ideal sites and resorts trying to offer comfortable accommodation in relation to their workers. Produced from sturdy metal, this housing product was made to withstand conditions that are tough supplying area sufficient just as much as a couple
The Dongji Customized Double-Decker Mobile Housing Steel Container Dormitory Construction Sites Hotels Simple Assembly Detachable Design is easy to produce and maneuver around as needed along side its easy construction and removable design. This can allow it to be a variety fantastic short-term housing at task internet sites or activities where flexibility is key. The movement double-decker lots of space for just two people to rest easily, because the steel construction guarantees durability and durability
Customizability is key with all the current Customized Double-Decker Mobile Housing Steel Container Dormitory Construction Sites Hotels Simple Assembly Detachable Design, one to tailor the device to your precise requirements since it enables. You can easily select from a number of features windows being including doorways, lighting, and floor coverings, combined with the choice to incorporate air-con and heating. This implies you can easily produce a space liveable is practical and comfortable when it comes to employees no matter what the current weather conditions are like
The design removable of Customized Double-Decker Mobile Housing Steel Container Dormitory Construction Sites Hotels Simple Assembly Detachable Design additionally causes it to be an easy task to change or increase to as required. If you like extra resting room or amenities, connect another product to be able to expand the living area. This permits you to definitely produce a full time income modified that satisfies the first requirements of this employees plus your task website
Assemble container house |
||||||||
Bottom
|
Frame structure |
2.3 mm thick profiled steel |
||||||
Floor |
MGO board, waterproof, fireproof |
|||||||
Roof
|
Frame structure |
2.3 mm thick profiled steel |
||||||
Outside cover |
0.426mm steel sheet |
|||||||
Insulation |
glass wool |
|||||||
Ceiling |
0.25mm steel sheet bottom tile |
|||||||
Color |
White, black, wood grain color, grass green |
|||||||
Use |
CarportHotel, House, Kiosk Booth, Office, Sentry Box, GuardHouse, ShopToilet, Villa, Warehouse, Workshop, Plant |
|||||||
Corner post |
2.3 cold rolled steel profile, galvanization, welded (160mm*160mm |
|||||||
Wall panel |
Sandwich panels with 50 mm rock wool or EPS foam |
|||||||
Window |
Aluminum alloy windows with dimension 925mm*1200mm(3mm single glass |
|||||||
Door |
Steel door with dimension 925mm*2035mm |
|||||||
Detailed parameters can be consulted customer service |
For Product:
1. How much manpower and time does it take to install the container
2 hours + 4 workers=1 unit
2. What tools and equipment do I need to prepare for the installation of container
Crane, hand saw, hand drill, hexagonal screwdriver, rubber hammer, utility knife, hole saw, non-slip gloves, glass glue gun, tape measure, medical box, marker, foot ladder, spirit level
3. How many days is your fastest lead time
This depends on the quantity. If it is a regular size, our lead time is generally 7-15 days after receiving the deposit
4. Can you customize colors
We are happy to accept color customization. The regular color of our boxes is white, which is popular and well received by customers all over the world. You can also provide the color card number for our reference. What color do you like
5. What is the largest size that can be made
The maximum can be 4m*8m, and the 8m surface is equipped with wind-resistant columns to support the top and bottom beams. What kind of functions and requirements are you based on
6. What is your payment method
Our payment method is generally TT (wire transfer), 30% deposit, and the remaining 70% paid before shipment
7. Does your product leak water
There are quite a number of domestic manufacturers, due to lack of professionalism and irresponsibility for quality, which leads to the problem of water leakage in the box
So far, our company has never experienced water leakage problems in overseas orders
8. Do you need a foundation
If the land will not subside, there is basically no need to lay foundations. According to different geological conditions, our company will provide guidance and suggestions. If you buy container from us, we will give you complete foundation drawings and we will have video instructions for installation
9. Can I add an extra roof please
Roofs can be added, and we can send you some pictures of roofing cases we have done before for your selection and reference. Do you want to add a roof based on wind resistance requirements, thermal insulation requirements or aesthetic requirements
10. How are your container house insulated
Wall panels are made of 50mm rock wool sandwich panels, and can be upgraded to 75mm and 100mm thickness, which i s better for extreme cold and hot weather
11. Can the floor be covered with insulation
Yes, no problem
For Service:
1. Can you please guide the installation
Yes, our company has a professional installation team to guide. What is the approximate quantity you purchased this time? If the quantity is more than 300 sets, we can guide the installation for free, you only need to be responsible for the engineer's visa, air tickets and room and board expenses
2. How do you guarantee quality
Answer: Every step of our production is checked by quality inspectors. We will use vernier calipers to measure the thickness of materials. We will also check whether the paint surface of the materials is in good condition before packing, and the wearing parts and spare materials will be shipped together. Before delivery, we will also take photos and videos for customers to confirm
3. If our losses are caused by your reasons, will we be compensated
Of course, we will compensate for our mistakes, and the compensation plan is also reached by a double-issue agreement, or compensation according to the requirements of the contract